News

News

You are here: Home » News » NEWS » Trenchless directional drilling construction process-3

News

Trenchless directional drilling construction process-3

Views:0     Author:Site Editor     Publish Time: 2020-10-30      Origin:Site

Trenchless directional drilling construction process-3

Trenchless directional drilling construction process-3

 

Towing pipeline

(1) After the welding of the crossing pipe section is completed, connect the drag head at the pipe end and separate each pipeline to avoid staggering.

(2) Connection of pipeline and drilling tool: drill pipe + φ500 reamer + 50t rotary joint + 50t U-shaped ring + drag head and the overall connection of the pipeline to be dragged back together.

(3) When all preparations are ready, start towing. Sandbags must be laid under the pipeline, one every 5 meters, and they must be separated from the ground. There must be a detectable copper wire on the pipeline to be dragged back. Place it on the top of the pipeline and wrap it tightly with tape every 2 meters. After dragging back, the copper wire should be exposed to the ground and connected to the excavated pipeline. . The towing should be done in one go without any pause in the middle until the PE pipe line is unearthed on the side of the rig.

 


PRODUCTS

More >>
SHANTUI Bulldozer Spare Parts
XCMG Wheel Loader
 Spare Parts
Liugong Wheel Loader Spare Parts
XCG Excavator Spare Parts
SHANTUI Bulldozer
QUESTION? LET US HELP.
Simple choose a support option from the icons below:
FOLLOW US ON:
Copyright © Hubei Fotma Machinery Co.,Ltd. Site Map  Powered by FOTMA