Trenchless directional drilling construction process-4

Views:0     Author:Site Editor     Publish Time: 2020-11-03      Origin:Site

Trenchless directional drilling construction process-4

Trenchless directional drilling construction process-4

 

Equipment dismantled, landform restoration

(1) After completing the crossing, clean and adjust the equipment, and evacuate the construction site.

(2) Treatment of backflow mud: The mud in the mud pool on the side of the earth and the excavation shall be treated after consultation with Party A. It is recommended to bury it on the spot or transport it to a treatment plant designated by the local environmental protection department for treatment, and then perform landform restoration.


PRODUCTS

More >>
SHANTUI Bulldozer Spare Parts
XCMG Wheel Loader
 Spare Parts
Liugong Wheel Loader Spare Parts
XCG Excavator Spare Parts
SHANTUI Bulldozer
QUESTION? LET US HELP.
Simple choose a support option from the icons below:
FOLLOW US ON:
Copyright © Hubei Fotma Machinery Co.,Ltd. Site Map  Powered by FOTMA